CATL selected by Primergy Solar for $1.2 bn Gemini project

By Editor

Share

CATL announced its battery supply agreement with Primergy Solar for the $1.2 billion Gemini Solar+Storage Project outside of Las Vegas, Nevada.

Gemini will be one of the largest operational solar + storage projects in the U.S. with a 690 MWac/966 MWdc solar array and 1,416 MWh storage capability. Earlier this year, Primergy selected several globally leading equipment suppliers and construction partners for the Gemini project.

CATL will supply Primergy Solar with EnerOne, a modular outdoor liquid cooling battery energy storage system.

With a cycle life of up to 10,000 cycles, the LFP-based battery product will contribute to the safe and reliable operation of the Gemini project. Primergy has selected the EnerOne solution for Gemini because it utilizes advanced lithium phosphate chemistry which meets Primergy’s requirements for safe and reliable operations at its sites.

Latest News

Related