Maxeon Solar says Bikaner 1 solar farm starts commercial operation

By Editor

Share

Maxeon Solar Technologies  announced the commercial operation of the 192-megawatt (MW) Bikaner 1 Solar Farm, a utility-scale power plant in Rajasthan, India.

This solar power plant utilizes a total of nearly 398,000 Performance 3 UPP solar panels from Maxeon Solar Technologies. The Bikaner 1 project is the largest Indian power plant project to utilize Maxeon’s Performance line panels.

Maxeon’s Performance line panels are the most deployed shingled-cell panels in the solar industry, and the Performance 3 UPP panels are engineered to meet the needs of large-scale power plants. With a rated efficiency of up to 20.9 percent, Performance 3 panels optimize power density and lower system cost.

Jeff Waters, CEO of Maxeon Solar Technologies, said: “This is the largest utility-scale project that we have supplied in India, and it is yet another example of how our utility scale customers trust Maxeon for their solar power plants.”

The Bikaner 1 power plant is forecast to produce approximately 800, 000 MWh per year and will remove 650,000MT of carbon emissions every year.

Shivanand Nimbargi, MD & CEO of Ayana Renewable Power, said: “Bikaner 1 is an important milestone that will allow us to meet the objective of a faster transition to low carbon power generation and contributing towards the development of local communities in parallel.”

Baburajan Kizhakedath
Baburajan Kizhakedath
Baburajan Kizhakedath is the editor of GreentechLead.com. He has three decades of experience in tech media.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest News

Related