The latest renewable energy news includes announcements on Maynards, Vestas wind equipment, Voltage Energy, CATL, and others.
Maynards to Auction 3 Vestas Wind Turbines, 22 Nacelles and 6 Towers on December 10
Maynards Group of Companies will auction millions of dollars worth of new, unused Vestas wind equipment on December 10, 2026, including three complete V150-4.5 MW turbines with combined capacity of 13.5 MW. The North American auction includes 22 nacelles across V120, V136, V150 and V100/V110 platforms, covering 2.2 MW, 3.8 MW, 4.0 MW and 4.2 MW models. Additional assets comprise 11 hub assemblies, six V150-4.2 MW steel towers manufactured in 2021 and three V136-3.8 MW drivetrains. Equipment is located in Colorado, Texas and Alberta. The online auction begins at 11 a.m. Mountain Time. Buyers face a 10 percent premium on complete turbines and nacelles and 15 percent on other components. Sales require seller confirmation.
Voltage Energy Launches 64 kW Solar Microgrid with 24-Hour Installation and 40% Energy Cost Savings
Voltage Energy introduced a modular solar microgrid system at RE+ 2026 in Las Vegas, designed for installation by three workers within 24 hours for a 64 kW configuration under suitable conditions. The company estimates approximately 40 percent lower electricity costs compared with on-site diesel generation, depending on operating assumptions. The system integrates solar panels, battery storage, inverters and backup diesel generators on a preassembled power skid. Voltage Energy also launched two electrical balance-of-system products: Load Break Disconnect Box (LBD) and Combiner Box (CBX). The CBX combines up to 16 photovoltaic string inputs into one inverter output. Its LYNX PLUS and IBEX platforms support trunk-bus and multi-string architectures. Voltage Energy’s North Carolina manufacturing facility entered pilot production in October 2026.
CATL Opens 1,200 Sq. Metre Battery Service Center in Türkiye, Targets 10,000 Global Locations by 2030
CATL has opened its first NING SERVICE Experience Center in Istanbul, Türkiye, covering more than 1,200 square metres for battery testing, diagnostics, repair, maintenance and refurbishment. Developed with Ascendum Türkiye, the facility supports electric vehicles and energy storage systems. CATL operates 1,429 service locations across more than 80 countries, employing over 9,900 service engineers and 10,000 certified technicians. Its 95 deep-repair centers cover 76.8 percent of EV models and 90 percent of repair jobs. More than 150 facilities use its Intelligent Eagle Eye System. CATL targets expansion to 100 countries by 2027 and 10,000 service locations by 2030. Türkiye’s energy plan targets 20 million electric vehicles and 140 GWh of energy storage requirements by 2040.
