Vestas receives order for Landtong Rozenburg wind project

By Editor

Share

Vestas has received an order from Eneco Verda B.V. a leading company in the Dutch and Belgian energy sector for the 34 MW wind project Landtong Rozenburg.

Located on a peninsula in the port of Rotterdam, the project features nine V126-3.45 MW turbines in 3.8 MW Power Optimised Mode with 130m towers. The customised wind solution will optimise the annual energy production at the sites’ high wind conditions, while offering competitive levelised cost of energy.

Stein van Woensel, head of Realisation Eneco says: “This landmark project will also deliver power via a new shore power system to various vessels in the port of Rotterdam.”

Alex Robertson, VP Sales Central, Vestas Northern & Central Europe, said: “Next year we will install turbines ranging from V100-2.0 MW to V150-4.2 MW in the Benelux region. Our product range was a key lever for delivering the optimal levelised cost of energy on this project as well and contributing to the sustainable energy goals of the Netherlands.”

The order is adding to Vestas’ installed onshore wind capacity of more than 2 GW in the country.

Deliveries are expected to begin in the first quarter of 2022 and commissioning is planned for the third quarter of 2022.

Latest News

Related