KBR wins engineering services contract from CrossWind

Siemens Gamesa offshore wind power business

KBR has won a contract to provide engineering services for an offshore energy storage project for CrossWind, a joint venture between Shell and Dutch utility company, Eneco.

KBR will perform a front-end engineering design of the baseload power hub (BLPH) for the Hollandse Kust (north) wind farm located offshore Netherlands.

KBR and Shell will design and develop facilities that integrate lithium-ion battery storage and green hydrogen electrolysis production at megawatt scale. The design will enable hydrogen production and electricity storage in periods of high-power production and will convert hydrogen to electricity, via a fuel cell, during periods of lower power production.