Huawei Digital Power signs contract with SEPCOIII for Red Sea Project

Huawei Digital Power

Huawei Digital Power signed a contract with SEPCOIII for the Red Sea Project with 400 MW PV plus 1300 MWh battery energy storage solution (BESS).

This 1300 MWh off-grid energy storage project is the largest of its kind in the world and represents a milestone in the global energy storage industry.

The Red Sea Project has been listed in the Saudi Vision 2030 as a key project. Its developer is ACWA Power, and the general contractor of EPC is SEPCOIII. Located on the Red Sea coast, NEOM is also known as the city of the future, powered entirely by renewable energy. It will lead a new way of life and drive new economic growth, as resources such as oil are increasingly depleted.