Today’s renewable energy news includes announcements from Chanani Group, Emerson, Everged, Stellar Solar, among others.
Chanani Group Launches CM EV Services to Expand EV Charging Infrastructure in California
Chanani Group has launched CM EV Services LLC to develop EV charging hubs across Southern California, advancing clean mobility and energy transition efforts. In partnership with Motive Energy as EPC provider, the initiative combines infrastructure development with engineering and operational expertise. Initial investment includes three high-speed EV charging hubs in Torrance, each featuring four 240 kW chargers designed for next-generation electric vehicles. The strategy focuses on scaling reliable, high-performance charging networks in urban locations. Beyond charging, the company is integrating solar-powered solutions at Bluestem Hotel, highlighting innovation in sustainable hospitality. The move strengthens Chanani Group’s growth strategy, supporting energy independence, reducing emissions, and accelerating EV adoption across the region.
Emerson to Power $2bn Carbon-Neutral Biomass Project in Louisiana with CCS Technology
Emerson has been selected by Strategic Biofuels to provide advanced automation for the $2 billion Louisiana Green Fuels (LGF) project, a first-of-its-kind biomass power plant integrated with carbon capture and sequestration (CCS). The 100MW facility will convert 1.3 million tonnes of forestry waste annually into renewable baseload electricity while capturing 1.1 million tonnes of CO₂ for permanent underground storage. Leveraging its DeltaV™ automation platform and digital technologies, Emerson will optimize efficiency and operational reliability. The project highlights major investment in carbon-neutral energy innovation, supporting grid stability and decarbonisation. Strategically, LGF positions Louisiana as a leader in scalable clean energy infrastructure and next-generation CCS deployment.
Everged Launches Zero-Cost EV Charger Replacement Program to Boost Charging Reliability
Everged has introduced its Zero Cost Swap Program, enabling property owners to replace outdated or non-functional EV chargers with modern infrastructure at no upfront cost. The initiative removes capital and operational barriers by covering equipment, installation, activation, and ongoing maintenance. The program deploys advanced Level 2 and DC fast chargers with 24/7 monitoring, real-time diagnostics, and high uptime performance, addressing reliability challenges in aging EV networks. Optional revenue-sharing models further enhance value for site hosts. Strategically, the offering supports rapid EV infrastructure expansion across commercial, municipal, and fleet sectors, improving user experience and accelerating EV adoption. The move highlights Everged’s innovation in scalable, cost-efficient electrification solutions.
Stellar Solar Powers 697kW Multifamily Project in California, Expanding Clean Energy Access
Stellar Solar Commercial has commissioned a 697kW solar system at Parkway Club Apartments in El Cajon, California, powering 267 residential units with 1,767 Canadian Solar panels. The project reflects growing investment in multifamily solar, extending renewable energy benefits beyond homeowners to renters. The installation highlights innovation through integrated solar and battery solutions, improving energy reliability and reducing costs for property operators. Stellar Solar’s tailored approach for commercial clients supports optimized energy performance and stronger returns on investment.
FAHEEMA P
