Site icon GreentechLead

NTPC starts operations at 8 MW Auraiya solar PV project

NTPC India power project

Power generation major NTPC commenced part commercial operations at the  8 MW Auraiya Solar PV Project in Uttar Pradesh.

“India’s largest power generator, NTPC commenced commercial operations for 8 MW capacity, out of total 20 MW Auraiya Solar PV Project in Uttar Pradesh effective today,” the company said in a statement.

Post this, NTPC and NTPC Group’s total installed and commercial capacity now stands at 51,163 MW and 62,918 MW respectively.

The present installed capacity of the group comprises 46 NTPC stations including 24 coal-based, seven combined cycle gas or liquid fuel, one hydro, 14 renewables and 25 joint ventures and subsidiaries stations.

Exit mobile version